The Kansas City Plant is a National Nuclear Security Administration (NNSA) facility managed and operated by Honeywell Federal Manufacturing & Technologies (formerly Bendix Aviation Corporation and Bendix Kansas City Division of Allied-Signal) that produces 85 percent of the nonnuclear material used in the United States nuclear weapon arsenal. It was renamed the Kansas City National Security Campus in 2015.
The plant produces non-nuclear mechanical, electronic, and engineered material components for U.S. national defense systems such as high-energy laser ignition systems, microwave hybrid microcircuit production, and miniature electromechanical devices. The plant also provides technical services such as metallurgical/mechanical analysis, analytical chemistry, environmental testing, nondestructive testing, computer-based training, simulations and analysis, and technical certification.
Video Kansas City Plant
Kansas City National Security Campus
In 2014, the Kansas City Plant moved to the renamed Kansas City National Security Campus, a state-of-art facility including manufacturing, laboratory, office, and warehouse space. The move saves the government about $100 million annually in operating costs and cut energy consumption by more than 50 percent.
The smaller, more efficient facility maintains the capability to assure the reliability, safety, and security of the nation's nuclear deterrent while enabling NNSA to recruit and retain the next generation of scientists and engineers.
Initially announced in 2009, the General Services Administration announced that Zimmer Real Estate Services and CenterPoint Properties had won a bid to build the replacement plant. The site, adjacent to the former Richards-Gebaur Air Force Base in south Kansas City near Grandview, Missouri. Zimmer and CenterPoint already owned the CenterPoint Intermodal Center across the street. The creative ownership method works this way: a government authority (the Kansas City Planned Industrial Expansion Authority) owns the land and improvements and leases the project to CPZ Holding LLC. CPZ Holding subleases it to CenterPoint Zimmer LLC, which sub-subleases it to the government. Upon expiration of the government authority's lease, CPZ Holding will own the project. Financing for the $750 million+ project cost was structured and provided by CGA Capital.
HNTB Architecture designed the campus, Gibbens Drake Scott Inc. designed the mechanical, electrical, and plumbing features, which consist of 1.5 million rentable square feet on the northwest corner of Missouri Highway 150 and Botts Road on the north edge of Richards-Gebaur.
The developers pay more than $5 million a year in payments in lieu of property taxes. Half is used to retire the debt service on $40 million worth of public infrastructure improvements and half funds local tax agencies.
Maps Kansas City Plant
History
The plant traces its history to the Pratt & Whitney plant dedicated by then Senator Harry S. Truman in 1942, which manufactured Double Wasp engines during World War II. In 1949 the Atomic Energy Commission commissioned the Bendix Corporation to build the non-nuclear components of nuclear warheads there. Bendix became AlliedSignal in 1983 and eventually Honeywell in 1999.
References
External links
- Home - Kansas City Plant
Source of the article : Wikipedia